![]()
Voters in Northport approved by a wide margin a proposed construction project for Edna Drinkwater School that would add 7,500 square feet to the existing building, and to install a new wood pellet boiler.
The $2.7 million school construction project was approved by a vote of 149 in favor to 20 opposed. A second referendum question asking residents to authorize $300,000 for installation of a wood pellet boiler was ...